All projects / Industry / District heating

District heating infrastructure - GPEC Gdańsk and SEC Szczecin

Insulation of steam pipelines, heat substations, valves and fittings with IzolPlus TERMO STOP compound in the district heating networks of two operators. Reference projects by Paweł Lulis.

Project Metrics

Location
Gdańsk / Szczecin, Poland
Date
June 2024
GPEC steam valve
210°C → 44°C
SEC energy gain
> 85%
Insulation system λ
0.000432 W/m·K

Facilities

Insulation of steam pipelines, heat substations, valves and fittings in the district heating networks of two operators: GPEC Gdańsk and SEC Szczecin. IzolPlus TERMO STOP compound.

Results

GPEC Gdańsk: steam valve - surface temperature 210°C → 44°C after application. SEC Szczecin: district heating chamber, insulation energy gain above 85% (expert opinion by Dr Eng. Adam Pawłowski).

SEC Szczecin district heating chamber: insulation with the IzolPlus system, system λ 0.000432 W/m·K, energy gain above 85% (expert opinion by Dr Eng. Adam Pawłowski). GPEC reference project: steam valve 210°C → 44°C surface.

The λ value of 0.000432 W/m·K applies to the pipe insulation system (with an air chamber), not to the IzolPlus compound itself.