IzolPlus project - before/after thermography
/ Case studies - measured data

Measurement before. Measurement after.

Thermography, energy savings and handover protocols from Adalio sites.

Choose a sector.

Every project is a before-and-after measurement. Filter by building type or scroll the full reports below.

/ Case study - Heritage

Heritage manor house (18th-19th century) - Nadułki

Heritage manor house (18th-19th century) - Nadułki
Nadułki, Poland - July 2026
Building documentation - Heritage manor house (18th-19th century) - Nadułki Before
Nadułki, Poland location
Heritage sector
Project documentation - Heritage manor house (18th-19th century) - Nadułki After
+9.5°C Reference tile
-5 to -6°C Summer temperature

Application of IzolGlass Active TT film on the window glazing of a heritage manor house. Window joinery replacement ruled out by conservation requirements. Contractor and owner - Sławomir Włoszczak, president of BOTI-CEL.

Case study file - Nadułki, Poland - July 2026

View report →

/ Case study - Residential

Roof of a multifamily building - Wałbrzych

Roof of a multifamily building - Wałbrzych
Wałbrzych, Daszyńskiego 25, Poland - September 2025
Building documentation - Roof of a multifamily building - Wałbrzych Before
Wałbrzych, Daszyńskiego 25, Poland location
Residential sector
Project documentation - Roof of a multifamily building - Wałbrzych After
6.4 m²·K/W Additional thermal resistance R
< 0.15 W/m²K Package U-value

Revitalization of roof covering under public procurement. Thin-Layer Hydro-Thermal Insulation System - 2 layers of compound plus 2 layers of IzolPlus Bitum paint on roofing felt.

Case study file - Wałbrzych, Daszyńskiego 25, Poland - September 2025

View report →

/ Case study - Industry / District heating

District heating infrastructure - GPEC Gdańsk and SEC Szczecin

District heating infrastructure - GPEC Gdańsk and SEC Szczecin
Gdańsk / Szczecin, Poland - June 2024
Building documentation - District heating infrastructure - GPEC Gdańsk and SEC Szczecin Before
Gdańsk / Szczecin, Poland location
Industry / District heating sector
Project documentation - District heating infrastructure - GPEC Gdańsk and SEC Szczecin After
210°C → 44°C GPEC steam valve
> 85% SEC energy gain

Insulation of steam pipelines, heat substations, valves and fittings with IzolPlus TERMO STOP compound in the district heating networks of two operators. Reference projects by Paweł Lulis.

Case study file - Gdańsk / Szczecin, Poland - June 2024

View report →

/ Case study - Heritage

Heritage townhouse from 1898 - Łomża

Heritage townhouse from 1898 - Łomża
Łomża, Plac Niepodległości 10, Poland - June 2023
Building documentation - Heritage townhouse from 1898 - Łomża Before
Łomża, Plac Niepodległości 10, Poland location
Heritage sector
Project documentation - Heritage townhouse from 1898 - Łomża After
≤ 2°C Floor-ceiling difference
Disappeared Freezing-through

IzolPlus coating on both sides (Termo-Fasada on the front facade, Termo-Wnętrze inside) without ETICS and without replacing joinery. Modernization confirmed by the Heritage Conservator.

Case study file - Łomża, Plac Niepodległości 10, Poland - June 2023

View report →

/ Case study - Education

Łazarski University - IzolPlus™ thermal modernization

Łazarski University - IzolPlus™ thermal modernization
Warsaw, Poland - June 2022
Building documentation - Łazarski University - IzolPlus™ thermal modernization Before
Warsaw, Poland location
Education sector
Project documentation - Łazarski University - IzolPlus™ thermal modernization After
IzolPlus™ Product
Facade, roofs, interiors Scope

Comprehensive improvement of the energy efficiency of the Łazarski University building in Warsaw using IzolPlus™ thermoreflective paints on facades, roofs and internal surfaces.

Case study file - Warsaw, Poland - June 2022

View report →

/ Case study - Heritage

Holy Cross Parish Church - Łapy

Holy Cross Parish Church - Łapy
Łapy, Podlaskie Voivodeship, Poland - December 2021
Building documentation - Holy Cross Parish Church - Łapy Before
Łapy, Podlaskie Voivodeship, Poland location
Heritage sector
Project documentation - Holy Cross Parish Church - Łapy After
-25 to -30% Energy bills
Eliminated Excess moisture

Full IzolPlus system during a major renovation of a heritage church - Termo-Fasada and Termo-Wnętrze paints plus thermal insulation compound. Over 3,000 litres of material. Window joinery replacement ruled out by conservation requirements.

Case study file - Łapy, Podlaskie Voivodeship, Poland - December 2021

View report →

/ Case study - Residential

Semi-detached building - Katowice (BIPLAN report)

Semi-detached building - Katowice (BIPLAN report)
Katowice, Poland - October 2014
Building documentation - Semi-detached building - Katowice (BIPLAN report) Before
Katowice, Poland location
Residential sector
Project documentation - Semi-detached building - Katowice (BIPLAN report) After
0.491 → 0.22 W/m²K Wall U-value
-15 to -25% Gas consumption

Two-sided IzolPlus coating (Termo-Fasada outside, Termo-Wnętrze inside) on a 0.4 m brick wall without insulation. Comparative gas consumption measurement over two heating seasons. Audit by Dr Eng. Grzegorz Kaczmarzyk.

Case study file - Katowice, Poland - October 2014

View report →

/ Thermal audit

Every project starts with thermographic measurement before application.

Request audit →

/ Trusted by

AAM Driveline
Łazarski University
GPEC Gdańsk
SEC Szczecin
Łapy Parish
Nadułki Manor
Łomża Townhouse

Your building - the next case study?

Before/after thermography, ROI scenario, application schedule.